Fully Compliant Domestic Wastewater Treatment System Installed. This recent projectinvolved the full installation of a domestic wastewater treatment plant – from initial groundworks and pipe tracing right through to commissioning, paperwork sign-off and final tidy-up.
Despite brutal weather conditions – including a midweek storm – we delivered a fully compliant, safe and operational system on schedule.








Scope of Works Completed
We managed this project from start to finish, ensuring full compliance with local regulations and environmental requirements.
Pipework Location & Site Preparation
- Located and traced existing pipework
- Set correct levels for gravity flow
- Marked out treatment plant position
- Prepared excavation area
- Excavation & Plant Installation
- Excavated and prepared base
- Installed wastewater treatment plant
- Ensured correct bedding and structural support
- Backfilled and compacted to specification
Pipe Connections & Drainage
- Installed inlet and outlet pipework
- Connected discharge outlet
- Ensured proper fall and flow levels
Electrical Connections
- Completed all electrical hook-ups
- Tested control panel functionality
- Verified system safety compliance
Commissioning & Compliance
- Full system commissioning
- Warranty documentation completed and signed off
- Consent of discharge received
- Field easements completed
- Final inspection and client handover
Site Clean-Up
- Ground reinstated
- Site left clean and tidy
- Client left with a fully compliant, safe wastewater system
Thinking of Improving Your Waste Water System?
If you’re based in Belfast or County Down in Northern Ireland and you’re planning to upgrade or install a new waste water treatment plant – we’re here to help.
📞 Call us now for a free, no-obligation quote on 07863343459
📧 silverbirchcontracts@outlook.com


Leave a Reply