Before, during and after photos of a commercial sewage treatment plant being installed in Donaghadee. Weather conditions were particularly difficult during this project, however we used a pump to remove the water from the hole so that the works could be completed.
Once the tank was installed it was filled with water, tied down to the base slab and cased in concrete to ensure it won’t emerge during wet weather or when the tank is emptied. We also carried out some ground reinstatement before completing this project.